Our costly and labor intensive adventures through "Big Old House" restoration and maintenance in the ever changing borough of Seminole Heights, Tampa, Florida
Monday, October 26, 2009
Winter To Do List
Was outside yesterday clearing some more weeds and vines in the back yard; our winter to do list was born. Siding behind the A.C unit is in bad shape, that will be replaced up to the windows, same with a patch of siding on the deck; this work will most likely reveal rotted sill as well. Also an area above the front porch will be replaced. What I'm really looking forward to is rebuilding the deck....it is pulling away from the house and looked terribly skewed; will will tear it down and rebuild, probably lower to the ground, using as much of the existing "Trex" materials as possible. Depending on the level of rot found with the siding, we may not get to the deck until next year. There is a "Frankenstein" door (pieced together in a rather rough manner) on the side of the house off the office which needs to be worked over and painted; we can probably fit that in before it gets too hot again. We will also repair a few of the windows which are in the worst shape.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment